CleanGo GreanGo

Safety Data Sheet

Oil and Gas Well Interventions CGII Site Operating Procedures

Application may include, but is not limited to, the following:

  • Fracture spearheading with acid
  • Casing/annular treatments from surface (to remediate perforation/reservoir plugging)
  • Placing product down the tubing through a packer with a rig on site
  • Hot-oiling/hot-watering to remediate paraffin buildup
  • Through reservoir enhanced oil recovery placement (e.g., augmentation of a water flood)

These treatments require a downhole schematic and an individual site-specific treatment program.

 

Shopping cart close